October 2016
1.0 Mount the transmitter
1.1 Liquid applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Mount the transmitter so the
drain/vent valves are oriented upward.
1.2 Gas applications
1. Place taps in the top or side of the line.
2. Mount beside or above the taps.
1.3 Steam applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Fill impulse lines with water.
Quick Start Guide
Flow
3