Finishing - Heat-N-Glo SL-550TRS-AUC Installation And Operation Instructions Manual

Table of Contents

Advertisement

1.5 FINISHING

The minimum clearance to combustibles are 0 from
the sides, floor, back and top (these clearances are
defined by the standoffs). The minimum distance to the
perpendicular side wall extending past the appliance
front is 2-inches (51mm). Clearance to a mantelpiece
is shown in Figure 27.
FIGURE 27
IF JOINTS BETWEEN THE FINISHED WALLS AND
THE FIREPLACE SURROUND (TOP AND SIDES)
ARE SEALED, A 300° F (149°C). MINIMUM SEAL-
ANT MATERIAL MUST BE USED. THESE JOINTS
ARE NOT REQUIRED TO BE SEALED. ONLY NON-
COMBUSTIBLE MATERIAL (USING 300° F. (149°C)
MINIMUM ADHESIVE, IF NEEDED) CAN BE AP-
PLIED AS FACING TO THE FIREPLACE SUR-
ROUND. SEE FIGURE 27.
11"
10"
9"
8"
7"
6"
5"
4"
3"
(152mm)
2"
5"
4"
(127mm)
3"
(102mm)
(76mm)
2"
(51mm)
TOP FRONT EDGE
OF FIREPLACE
TOP SEAL
JOINT
SIDE SEAL
JOINT
1/2"
(13mm)
23
CEILING
31"
(787mm)
12"
12"
(305mm)
11"
(279mm)
10"
(254mm)
9"
(229mm)
8"
(203mm)
7"
(178mm)
6"
FINISH MATERIAL
MAY BE COMBUSTIBLE
- TOP AND SIDES
OF UNIT
1/2"
(13mm)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents