Step 10. Finishing
Step 11. Installing Trim, Logs & Ember Material
!
CEILING
8" MAXIMUM
MANTLE
31"
12"
MINIMUM
HOOD
CAUTION: IF JOINTS BETWEEN THE FINISHED WALLS
AND THE FIREPLACE SURROUND (TOP AND SIDES)
ARE SEALED, A 300° F. MINIMUM SEALANT MATE-
RIAL MUST BE USED. THESE JOINTS ARE NOT RE-
QUIRED TO BE SEALED. ONLY NON-COMBUSTIBLE
MATERIAL (USING 300° F. MINIMUM ADHESIVE, IF
NEEDED) CAN BE APPLIED AS FACING TO THE FIRE-
PLACE SURROUND. SEE THE DIAGRAM BELOW.
STUD
HEADER
GLASS
ASSEMBLY
FINISHED
WALL
SEAL JOINT
(300° F/149° C MIN.)
WING NUT
MOUNTING
STUD
GLASS CLIP