Heat-N-Glo SL-550TRS-AUC Installation And Operation Instructions Manual page 16

Table of Contents

Advertisement

V 1
H
2
FIGURE 15
V (FT.)
1´ MIN. (.3M)
2´ MIN. (.6M)
3´ MIN. (.9M)
4´ MIN. (1.2M)
NOTE: V + V, + H + H
H
1
USE D-SERIES
COMPONENTS ONLY.
FLUEING WITH THREE (3) 90° ELBOWS
H (FT.)
1´ MAX. (.3M)
2´ MAX. (.6M)
4´ MAX. (1.2M)
6´ MAX. (1.9M)
H = 6´ MAX. (1.9M)
H+H
= 10´ MAX. (3.0M)
1
= 30' (9.1M) MAX.
1
V
H
FLUEING WITH THREE (3) 90° ELBOWS
V (FT.)
H (FT.)
1´ MIN. (.3M)
1´ MAX. (.3M)
2´ MIN. (.6M)
2´ MAX. (.6M)
3´ MIN. (.9M)
3´ MAX. (.9M)
4´ MIN. (1.2M)
4´ MAX. (1.2M))
V + H + H
+ H
= 30´ MAX. (9.1M) H = 4´ MAX. (1.2M) H + H
1
2
H
1
16
H + H
(FT.)
1
3´ MAX. (.9M)
5´ MAX. (1.5M)
8´ MAX. (2.4M)
10´ MAX. (3.0M)
H + H
+ H
1
2´ MAX. (.6M)
4´ MAX. (1.2M)
8´ MAX. (2.4M)
10´ MAX. (3.0M)
+ H
= 10´ MAX. (3.0M)
1
2
V
H
(FT.)
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents