2.16
Overwrite All Data Function
% Check that all data has been overwritten and erased properly. Data is not erased properly if an error
occurs during the procedure. For details, contact your Service Representative.
% When the main power switch is turned off, then on again, wait at least 10 seconds to turn it on after
turning it off. if there is no wait period between turning the main power switch off, then on again,
the machine may not function properly.
% After the main power switch has been turned on, quickly turn it off and give the machine to the
Service Engineer. If the Overwrite All Data function is executed by mistake, contact the Service En-
gineer. For details, contact your Service Representative.
bizhub C658/C558/C458
2
2-76