Operating Nailer - Grizzly T27338 Owner's Manual

3-in-1 flooring nailer
Table of Contents

Advertisement

4. Place nailer on side to access guide
plate (see Figure 11).
5. Remove (3) flat head cap screws that
secure guide plate to bottom of nailer
(see Figure 11), and remove guide
plate.
Flat Head
Cap Screw
Guide Plate
Figure 11. Removing guide plate.
6. Install replacement guide plate with flat
head cap screws removed in Step 5.
-12
-

Operating Nailer

Read the safety instructions in this
manual before operating the nailer.
If an automatic air line oiler is not used,
before operating the nailer, place several
drops of pneumatic tool oil into the quick-
connect fitting.
To operate nailer:
1. Install correct guide plate for size of
flooring material (refer to Changing
Guide Plate on Page 11).
2. Install nails/staples in magazine (refer
to Loading Nailer on Page 10).
3. Place flooring nailer on ground with
nailer guide plate facing down, then
connect air source to quick-connect
fitting.
IMPACT INJURY!
Point nailer at ground when con-
necting to air source. To prevent
serious injury, NEVER aim in direc-
tion of another person or body part.
4. Position flooring strip and lightly tap it
into place with metal side of hammer.
DO NOT use nailer to position flooring
strips.
Note: Test nailer on sample flooring
strip when installing pre-finished floor-
ing to make sure nailer does not dam-
age finish. Replace base plate if it is
damaged and marring flooring finish.
Model T27338 (Mfd. Since 01/15)

Advertisement

Table of Contents
loading

Table of Contents