Chapter 4 Performance Checks; General; Power-Up Self Test - Motorola CP140 Basic Service Manual

Commercial series
Hide thumbs Also See for CP140:
Table of Contents

Advertisement

Chapter 4 Performance Checks

4.1

General

These radios meet published specifications through their manufacturing process by utilizing high-
accuracy laboratory-quality test equipment. The recommended field service equipment is as accurate
as the manufacturing equipment with few exceptions. This accuracy must be maintained in
compliance with the manufacturer's recommended calibration schedule.
Power Cable
RLN4510
Power
Radio
Supply
Battery
Eliminator
4.2

Power-Up Self Test

Applying power to the radio by using the on/off volume control, starts a self-test routine which checks
the RAM, EEPROM hardware and EEPROM checksum. Pressing and holding SB1 while turning on
the radio causes the self-test routine to check for the ROM checksum as well. If these checks are
successfully completed, the radio will generate the Self-Test Pass Tone. If the self-test is not
successful, a Self-Test Fail Tone is heard.
BNC
RF Adaptor
5886564Z01
Program/ Test Cable
PMKN4004
RIB
RLN4008
RIB Power Supply
Figure 4-1. Radio Tuning Setup
30 dB Pad
Transmit
30 dB Pad
RF Generator
Receive
Audio In
Test Box
RLN4460
Computer Interface
Cable
Service Monitor or
Counter
Wattmeter
Tx
Audio Generator
Rx
Sinad Meter
AC Voltmeter
Tx Data
Rx
Data
Gnd

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp180Cp160

Table of Contents