Osi/Ip Scenario 5: Gne Without An Osi Dcc Connection - Cisco ONS 15600 Series Reference Manual

Multiservice switching platform (mssp)
Hide thumbs Also See for ONS 15600 Series:
Table of Contents

Advertisement

9.7.9 OSI/IP Networking Scenarios
Figure 9-33
ONS NE
OSI/PPP/DCC
ONS NE
1
2

9.7.9.5 OSI/IP Scenario 5: GNE Without an OSI DCC Connection

OSI/IP Scenario 5
connection to the DCN. It does not have an OSI DCN connection to carry CTC/CTM IP traffic through
an IP-over-OSI tunnel. A separate DCN to ONS 15600 NE connection is created to provide CTC/CTM
access.
Cisco ONS 15600 Reference Manual, R7.0
9-50
OSI/IP Scenario 4: Multiple ONS DCC Areas
CTC/CTM
IP
2
2
OSI/
LAP-D/
DCC
ONS NE
IP and
IP and
OSI/PPP/DCC
ONS NE
The IP OSS manages ONS 15600 and other vendor NEs using TL1 and FTP.
A separate tunnel is created for each isolated ONS 15600 DCC area.
(Figure
9-34) is similar to OSI/IP Scenario 3 except that the OSI GNE only has an IP
1
IP OSS
IP
IP DCN
IP
IP
2
OSI
Other
vendor GNE
OSI/
OSI/
LAP-D/
LAP-D/
DCC
DCC
ONS NE
IP and
OSI/PPP/DCC
ONS NE
Chapter 9
Management Network Connectivity

Advertisement

Table of Contents
loading

Table of Contents