Ac Power Supply Connections; Probe Cable Preparation - ABB Endura AZ30 series Programming Manual

Integral probe and remote transmitter combustion oxygen monitor
Hide thumbs Also See for Endura AZ30 series:
Table of Contents

Advertisement

Endura AZ30 series integral probe and remote transmitter
Combustion oxygen monitor
Caution.
If ABB cable is not used, always route signal leads and power cables separately, preferably in
earthed (grounded) metal conduit.
Make connections only as shown.
Maintain Environmental Protection at all times.
Ensure the seal and mating surfaces are clean to maintain environmental rating.
Conduit connections must provide cable entry sealing.
Ensure cable glands are tightened after wiring. Do not overtighten the cable glands to avoid
destroying their sealing properties. Initially, tighten finger-tight, then a further
suitable spanner or wrench.
Fit blanking plugs where required.
Inductive loads must be suppressed or clamped to limit voltage swings.
Operation of outputs is programmable.

5.1.1 AC Power Supply Connections

Note. Tighten power supply terminal screws to a torque of 0.8 Nm (7 lbf.in).
Internal earth terminal –
Fig. 5.1 AC Power Supply Connections

5.2 Probe Cable Preparation

Refer to Probe User Guide OI/AZ30P–EN for probe cable preparation details.
COI/AZ30E–EN Rev. D
Fuse
Line
Neutral
F
see
in Fig. 5.2
5 Electrical Installation
1
/
2
100 to 240 V AC (±10 %)
50 / 60 Hz
Warning.
Use fuse rated
1.6 A Type F only
3
to
/
turn using a
4
19