5.1 Unpacking

Unpack the furnace carefully and inspect it for any damage that may have
occurred during shipment. If there is shipping damage, notify the carrier
immediately.
Verify that the following components are present:

5.2 Set-Up

Place the calibrator on a flat surface with at least 6 inches of free space around
the instrument. Plug the power cord into a grounded mains outlet. Observe that
the nominal voltage corresponds to that indicated on the back of the calibrator.
Carefully insert the probe sleeve into the well. (DO NOT drop the sleeve in the
well.) Probe sleeve holes should be of the smallest diameter possible while still
allowing the probe to slide in and out easily. Sleeves with various hole sizes are
available from Hart Scientific. The well must be clear of any foreign objects, dirt
and grit before the sleeve is inserted. The sleeve is inserted with the two small
tong holes positioned upward.
Turn on the power to the calibrator by toggling the switch on the power entry
module. The fan should begin quietly blowing air through the instrument and the
controller display should illuminate after 3 seconds. After a brief self-test the
controller should begin normal operation. If the unit fails to operate please check
the power connection.
Find Quality Products Online at:
9150 Furnace
3150, Insert
Insert Insulator
Power Cord
Manual
RS-232 Cable
GlobalTestSupply
www.
Chapter 5

Quick Start

.com
sales@GlobalTestSupply.com
5-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents