Install Vent Piping To Relief Valves; Optional Pumpout System Piping Schematic Without Storage Tank; Pumpout Unit - Carrier 23XRV Installation Instructions Manual

High-efficiency variable speed screw chiller with greenspeed intelligence 50/60 hz hfc-134a
Hide thumbs Also See for 23XRV:
Table of Contents

Advertisement

COOLER
a23-1545
SERVICE VALVE ON
=

PUMPOUT UNIT

Fig. 57 — Optional Pumpout System Piping Schematic without Storage Tank — Configured to Store
Refrigerant in Cooler or Condenser (Unit with R Compressor Shown)
FRAME
ASSEMBLY
CONTROL
PANEL
VALVE
2
VALVE
3
VALVE
4
VALVE
5
ENTERING
WATER
LEAVING
a23-1546
CONDENSER
WATER
Fig. 58 — Pumpout Unit
INSTALL VENT PIPING TO RELIEF VALVES —
The 23XRV chiller is factory equipped with relief valves on
the cooler and condenser shells. Refer to Fig. 59 and Table 21
for size and location of relief devices. Vent relief devices to the
outdoors in accordance with ANSI/ASHRAE 15 (latest
edition) Safety Code for Mechanical Refrigeration and all
other applicable codes.
COOLER INLET
11
ISOLATION VALVE
CONTROL CENTER
DISCHARGE ISOLATION
VALVE (OPTIONAL)
SERVICE VALVE ON
=
CHILLER
COMPRESSOR
OIL
HEATER
OIL FILL
FITTING
OIL
SEPARATOR
COOLER REFRIGERANT
COOLER CHARGING
PUMPOUT VALVE
7
VALVE
PRESSURE
RELIEF SAFETY
VALVE
PUMPOUT
COMPRESSOR
2
3
4
5
Refrigerant discharged into confined spaces can displace
oxygen and cause asphyxiation.
1. Dual pressure relief valves are mounted on the three-way
valves in some locations to allow testing and repair with-
out transferring the refrigerant charge. Three-way valve
shafts should be turned either fully clockwise or fully
counterclockwise so only one relief valve is exposed to
refrigerant pressure at a time.
The flow area of discharge piping routed from more than
one relief valve, or more than one heat exchanger, must
be greater than the sum of the outlet areas of all relief
valves that are expected to discharge simultaneously. All
relief valves within a machinery room that are exposed to
refrigerant may discharge simultaneously in the event of a
fire. Discharge piping should lead to the point of final
release as directly as possible with consideration of pres-
sure drop in all sections downstream of the relief valves.
2. Provide a pipe plug near outlet side of each relief device
for leak testing. Provide pipe fittings that allow vent
piping to be disconnected periodically for inspection of
valve mechanism.
3. Piping to relief devices must not apply stress to the
device. Adequately support piping. A length of flexible
tubing or piping near the relief device is essential on
spring-isolated machines.
4. Cover the outdoor vent with a rain cap and place a
condensation drain at the low point in the vent piping to
prevent water build-up on the atmospheric side of the
relief device.
49
1b
CONDENSER
CHARGING
VALVE
1a
1a
SERVICE VALVE
OIL
SEPARATOR
PUMPOUT
CONDENSER
PUMPOUT
CONDENSER
WATER SUPPLY
AND RETURN
DANGER

Advertisement

Table of Contents
loading

Table of Contents