Motor Terminal Box (P Compressor); Motor Terminal Insulation (Q And R Compressors) - Carrier 23XRV Installation Instructions Manual

High-efficiency variable speed screw chiller with greenspeed intelligence 50/60 hz hfc-134a
Hide thumbs Also See for 23XRV:
Table of Contents

Advertisement

STUD
INSULATOR
INSULATION
PAD
TERMINAL
ENCLOSURE
FRAME
WASHER
T2
T3
MOTOR
TERMINAL
STUD NUTS
SECTION C-C
FROM FIG. 38
a23-1577
Fig. 39 — Motor Terminal Insulation (Q and R Compressors)
FRAME
FRAME
Fig. 38 — Motor Terminal Box (P Compressor)
TERMINAL
BOX
FRAME
INTERNAL/EXTERNAL TOOTH
LOCK WASHER
BETWEEN TERMINAL
BOX FRAME AND
PE/GROUND CABLE LUG
SEAL
STRIP
WASHER
NUT
PE/GND CABLE
CENTER TERMINAL ENCLOSURE
FRAME OVER TERMINAL BOX
FRAME ASSEMBLY
FOAM
INSULATION
WIRE
TIES
VIEW LOOKING DOWN
37
VFD/MOTOR
TRANSITION BOX
(DISASSEMBLED)
a23-1710
0.38 in. (9.7 mm)
APPROX.
MOTOR POWER CABLES
(MAY BE 1 OR 2 PER
TERMINAL)

Advertisement

Table of Contents
loading

Table of Contents