Thrush Aircraft S2R–T660 Maintenance Manual page 82

Turbo thrush
Table of Contents

Advertisement

5.
Tq pressure transmitter (NOTE: This not installed on aircraft with direct reading Tq
gauge.).
After wiring harness has been removed from above items,
remove the grommet at basket assembly aft. Close out and
carefully pull the harness aft and clear of basket. Secure
harness to prevent damage until ready to re-install.
6.
Ng tach generator.
7.
Oil temperature sending unit.
8.
Ignition leads at exciter box.
9.
Starter/generator terminal block.
10.
Fuel flow transducer (If equipped).
11.
Engine ground cable from rear of engine driven boost pump.
J.
Disconnect the engine controls.
Tag and retain all attaching control cable parts for engine
installation. Note clamp locations to facilitate control cable
installation.
1.
Disconnect the propeller control rod end at the propeller governor control
lever and remove the cable from the forward fireseal.
2.
Remove the prop cable from the forward fireseal.
4 – 9
THRUSH AIRCRAFT INC - T660 TURBO THRUSH
AIRCRAFT MAINTENANCE MANUAL
* NOTE *
* NOTE *
Effective: 12/17/03

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Thrush Aircraft S2R–T660

Table of Contents