Elation FUZE PAR Z120 IP User Manual page 13

Table of Contents

Advertisement

CLAMP INSTALLATION
The fixture provides an integrated mounting dual bracket / yoke. When mounting
this fixture to truss be sure to secure an appropriately rated clamp to the mounting
bracket / yoke using a M10 screw fitted through the center hole. Be sure to attach
an appropriate
Safety Cable
rigging point integrated into the back of the fixture.
RIGGING
Overhead rigging requires extensive experience, including amongst others
calculating working load limits, installation material being used, and periodic safety
inspection of all installation material and the fixture. If you lack these qualifications,
do not attempt the installation yourself. Improper installation can result in bodily
injury. Fixture is fully operational in the specific mounting positions illustrated below.
w w w . e l a t i o n l i g h t i n g . c o m
(not included) to the fixture using the safety cable
13
S A F E T Y C A B L E
ALWAYS ATTACH A SAFETY CABLE TO
THE FIXTURE WHENEVER INSTALLING
IN A SUSPENDED ENVIRONMENT TO
ENSURE THE FIXTURE WILL NOT DROP
IF CLAMP FAILS.
FUZE PAR Z120 IP™ User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dw par z19 ip

Table of Contents