SECTION 3 – OPERATION
Initial Start Preparation
The first time a compressor is started requires a special procedure. Follow the procedures
in this section for each of the following:
Coupling Alignment
•
Coupling Lubrication
•
Main Driver Preparation
•
Control System Adjustment
•
Inlet Valve / Inlet Guide Vane and Bypass Valve Adjustment
•
Lube system Adjustment
•
Oil Pressure Setting
•
The preparation for and the initial start-up of the Centac compressor should be done
under supervision of an Ingersoll-Rand service supervisor.
Coupling lubrication is critical. The use of proper and sufficient lubrication is
part of a successful installation. Do not use oil in gear couplings.
Do not run the Centac compressor without lubricating coupling.
NOTE
WARNING
CAUTION
Centac Instruction Manual
2000 Ingersoll-Rand Company
Date of Issue: December, 2003
3.5