Ingersoll-Rand GHH RAND SV205 Installation Operating & Maintenance Manual

Ingersoll-Rand GHH RAND SV205 Installation Operating & Maintenance Manual

Rotary vane compressor

Advertisement

Quick Links

EN
Installation, Operating
& Maintenance Manual
(Original Instructions)
SV205
Rotary Vane
Compressor
May 2023
www.ingersollrand.com/ghhrandtransport

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GHH RAND SV205 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Ingersoll-Rand GHH RAND SV205

  • Page 1 Installation, Operating & Maintenance Manual (Original Instructions) SV205 Rotary Vane Compressor May 2023 www.ingersollrand.com/ghhrandtransport...
  • Page 2 WICHTIG! Elektronische Versionen der Installations-, Betriebs- und Wartungshandbücher der SV150 und SV205 sowie der Serviceanleitungen können von der Website www.ingersollrand.com/ghhrandtransport heruntergeladen werden. IMPORTANT! Electronic versions of the SV150 & SV205 Installation, Operating & Maintenance Manual’s plus Service Instruction Manual’s can be downloaded from Website www.ingersollrand.com/ghhrandtransport. IMPORTANT ! Les versions électroniques des manuels d'installation, d'utilisation et d'entretien du SV150 et du SV205, ainsi que des manuels d'instructions de service, peuvent être téléchargées à...
  • Page 3: Table Of Contents

    Contents Chapter Page Health & Safety Health & Safety Issues General Product General Description Power Options Storage/Low Use Dimensions, performance data, and operating environment Installation General Mounting Lifting Mounting orientations Lubrication PTO and prop. shaft drive alignment Machine and PTO alignment Pipe work Ancillaries Operating and commissioning...
  • Page 4: Health & Safety Issues

    Health & Safety Read the whole manual before commencing installation. Static electricity Ensure, that where required, the compressor and ancillaries are earthed in accordance with BS5958 Part 1 1983; ‘Control of Undesirable Static Electricity’. Powder-air combinations are potentially explosive. Drive line It is the responsibility of the installer of the equipment to ensure all rotating and moving parts of the installation are adequately guarded to a standard which complies with the prevailing safety legislation.
  • Page 5: General

    General 2.1 Product general description The SV205 is a light-weight, compact rotary vane compressor designed for the oil free discharge of bulk liquids from general purpose tankers, e.g. liquid foodstuff, solvents, acids alkalis, hot bitumen, resins and other chemicals. The main advantage of using a compressor to discharge liquids is that the product does not come into contact with machine.
  • Page 6 General For Element Removal Dimension "A" to be a Max. of 1 metre No. Description Inlet filter kit - flexible SV205 inlet filter Basic SV205 Machine Relief Valve Isolating Valve Check (Non-Return) Valve Micronic Discharge Filter Alternative For hard piping Figure 1.
  • Page 7: Dimensions, Performance Data, And Operating Environment

    General 2.4 Dimensions, Performance Data & Operating Environment Dimensions The dimensions of the compressor are shown in figure 2 below. Performance The performance details and power requirements of the SV205 compressor are shown on the product data sheet. For additional information, the constant running torque does not exceed: 78 Nm Speed range 1000 - 1600 rpm Product Data can be found on the machine nameplate which is mounted on the side of the...
  • Page 8: Installation

    Installation 3.1 General For the recommended layout of the machine and ancillaries, see figure 1. When selecting the machine mounting position, the following points should be considered: Caution • Direction of input rotation to the machine must be correct and is simple to change by swapping over the plastic cowls (see section 3.6 for how to change the machine input Operating in reverse, rotation) and driving the shaft at the other end of the machine.
  • Page 9: Lifting

    Installation 3.3 Lifting The weight of the compressor without ancillaries is 42 kg and we recommend that the machine Caution is lifted with the eyebolt supplied. Alternatively the machine must be supported/lifted under the main body and not by the plastic cowls Only lift/support the machine using the Any equipment used for lifting the machine should be rated accordingly.
  • Page 10: Pto And Prop. Shaft Drive Alignment

    Installation 3.6 PTO and prop. shaft drive alignment Changing the machine rotation The current direction of input rotation is indicated by cast arrows on the compressor body. Note Changing rotation is a simple process of swapping over the plastic cowls, key & drive flange as shown in the diagram below.
  • Page 11: Machine And Pto Alignment

    Installation 3.7 Machine and PTO Alignment The drive axis on the majority of PTO’s is at 3 - 5° to the horizontal, which reflects the angle of the engine and gearbox. The compressor should be mounted so that its drive axis is parallel to the PTO’s drive axis Note (within 1 degree) - see fig 7.
  • Page 12 Installation Ref. Description SV205 CW BASIC MACHINE OVAL GASKET DISCHARGE OVAL FLANGE, WELD IN STAINLESS STEEL * STUD * WASHER * NUT INLET FILTER AND KIT Consisting of: INLET FILTER consisting of 7.1.a RAINCAP 7.1.b MOUNTING BAND 7.1.c INDICATOR FILTER KIT consisting of DUCT &...
  • Page 13: Ancillaries

    Installation 3.9 Ancillaries Air Inlet Filter and Flexible Induction Kit. (Fig 8, items 7) Note The inlet filter is necessary to clean the air entering the machine to prevent problems through large particle ingress and long term problems by small particles eroding main Do not mount the bore components.
  • Page 14: Operating And Commissioning

    Operating and Commissioning 4.1 Pre-operating check list Tick when completed Flexible and welded pipe bores etc cleaned after fabrication. All flanges, fasteners and mountings secure. Vehicle PTO disengaged. Engine management system set-up correctly for the application. Blow (ball) valve open (if starting against a tank pressure). Commissioning/testing 1.5 - 2”...
  • Page 15: Driver Training

    Operating and Commissioning 4.3 SV205 Driver training Driver training should be given whenever possible and should include:- Safety Instruct the driver regarding: • Rotating parts • Hot Pipework • Pressure Relief valve • Safety couplings Operation Instruct the driver regarding: •...
  • Page 16: Maintenance

    Maintenance 5.1 Schedule Daily • Monitor the inlet filter blockage indicator. Note • Clean the fans, fan covers and body ribs. • Check air filter and pipe work for leaks. Weekly Where the compressor is mounted on a vehicle and located outside, The compressor can should be operated for at least 15 minutes each week (twice a week be carefully cleaned...
  • Page 17: Air Inlet Filter

    Maintenance 5.6 Air inlet filter The blockage indicator is designed to show/hold the maximum inlet blockage encountered. It is set to show 100% blockage when the inlet depression reaches 50mbar. If the indicator valve has entered the red portion of the scale (when the compressor is operating), the filter must be cleaned or replaced by employing one or both of the following processes: Remove accumulated filter debris (machine not running)
  • Page 18: Checking The Blade Wear

    Maintenance 5.7 Checking the blade wear Note Using the drawing (fig 11) below, check the blade wear as follows: 1. Remove the pipework from the suction port. Failure to replace the blades in line 2. Turn the rotor, in the direction of rotation, until one of the blade slots can be seen with the through the port.
  • Page 19 Notes 47815111 A Date: 05/23 SV205 Installation, Operating & Maintenance Manual...
  • Page 20 47815111 A Date: 05/23 SV205 Installation, Operating & Maintenance Manual...
  • Page 21 HEAD OFFICE Max-Planck-Ring 27 46049 Oberhausen Germany Telephone: +49 (0)208.9994-0 Fax: +49 (0)208.9994-179 www.ingersollrand.com/ghhrandtransport EN.05/23...