SECTION 1 PLANNING & INSTALLATION
It has been delivered to the job site and is awaiting installation.
It has been installed but operation is delayed pending completion of plant
construction.
There are long periods (30 days or more) between operating cycles.
The plant (or department) is shut down.

Installation Planning

General
Proper installation is a critical component of satisfactory operation of all rotating machinery.
Proper support of the machinery is required to give maximum reliability at minimum
operating cost. In addition, a well-designed installation will result in lower installation and
operating costs. See the General Arrangement drawing for compressor/customer connection
details and lift points. Contact your local Ingersoll-Rand representative for further
information.