SECTION 1 PLANNING & INSTALLATION
•
It has been delivered to the job site and is awaiting installation.
•
It has been installed but operation is delayed pending completion of plant
construction.
•
There are long periods (30 days or more) between operating cycles.
•
The plant (or department) is shut down.
Installation Planning
General
Proper installation is a critical component of satisfactory operation of all rotating machinery.
Proper support of the machinery is required to give maximum reliability at minimum
operating cost. In addition, a well-designed installation will result in lower installation and
operating costs. See the General Arrangement drawing for compressor/customer connection
details and lift points. Contact your local Ingersoll-Rand representative for further
information.