Completing The Installation; Power On / Boot Up - GE LOGIQ V5 Service Manual

Hide thumbs Also See for LOGIQ V5:
Table of Contents

Advertisement

GE
D
5496012-100, R
IRECTION
Section 3-5

Completing the Installation

3-5-1

Power On / Boot Up

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
3-5-1-2
Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3
EVISION
Figure 3-3 Power On/Off Switch
Chapter 3 - System Setup
LOGIQ V5/LOGIQ V3
B
S
M
ASIC
ERVICE
ANUAL
3 - 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq v3

Table of Contents