Ckp Sensor Inspection; Ckp Sensor Removal And Installation; Iap/Tp/Iat Sensor Inspection; Et Sensor Inspection - Suzuki 125 Service Manual

Hide thumbs Also See for 125:
Table of Contents

Advertisement

SENSORS

CKP SENSOR INSPECTION

The crankshaft position sensor is installed in the generator
cover. (Page 44)

CKP SENSOR REMOVAL AND INSTALLATION

• Remove the generator cover. (RV125K3 3-14)
• Install the generator cover in the reverse order of removal.

IAP/TP/IAT SENSOR INSPECTION

The intake air pressure sensor/throttle position sensor/intake air
temperature sensor are combined into one and installed in the
throttle body. (Page 47, 52 and 61)
Do not attempt to remove the IAP/TP/IAT sensor from
the throttle body. It is available only as a throttle body
assembly.

ET SENSOR INSPECTION

The engine temperature sensor is installed in the cylinder.
(Page 57)
• Remove the ET sensor. (Page 80)
• Check the ET sensor by testing it at the bench as shown in
the figure. Connect the ET sensor 1 to a circuit tester and
place it in the oil 2 contained in a pan, which is placed on a
stove.
• Heat the oil to raise its temperature slowly and read the col-
umn thermometer 3 and the ohmmeter.
RV125K7 ('07-MODEL) 79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rv125

Table of Contents