IDEAL IMAX XTRA E320 Installation And Servicing page 12

Hide thumbs Also See for IMAX XTRA E320:
Table of Contents

Advertisement

8
PACKAGING REMOVAL / REMOVAL FROM PALLET
The boiler comprises of an equally sized Master
and Slave Module, separately packed on their
own pallets. This allows the boiler to be handled
by a forklift.
The packaged boiler will pass through a 930mm
wide opening. Removing the casing assembly
pack from the Master Module will allow Modules
through a 700mm wide opening.
4
3
12
INSTALLATION
To unpack the modules:
-
Carefully remove the straps, and lift off the casing assembly pack -
master only.
-
Open Master Module box and remove literature pack.
-
Remove the protective cardboard fittings.
-
Safely dispose of all packing materials.
To remove the Modules from base:
1. Remove 2 screws securing casing support outrigger and discard item
(Master only).
2. Remove the 3 front screws (2 screws on 320 model) on both sides
leaving the 2 rear screws in place.
3. Rotate bottom battens outwards allowing the front of the base to rest
on the floor.
4. Remove 4 screws and retaining brackets.
5. Slide the module off the base.
Repeat Steps 2 - 5 for slave module.
2
5
3
Rear screw on
both sides to
be left in place
1
im8481
IMAX XTRA -
Installation & Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imax xtra e400Imax xtra e480Imax xtra e560

Table of Contents