Chapter 3: Connect Incoming 120 Vac Wires - Nabco GT 1175 Installation Manual

With u30 microprocessor controller
Hide thumbs Also See for GT 1175:
Table of Contents

Advertisement

www.NabcoEntrances.com
Rev. 8-25-16
CHAPTER 3: CONNECT INCOMING 120 VAC WIRES
DANGER
Notice:
1.►Ensure all power is disconnected at the Junction box.
2.►Ensure all power to the GT-1175 Slide Door is Off.
3.►Inspect the location and grade of all Incoming 120 VAC power cables.
4.►Insert all Incoming 120 VAC, single phase, 5 amp (minimum) power wires into the pre drilled
CAUTION
5.►Please see Figure 3-1, to follow steps on how to connect Incoming 120 VAC wires to
CAUTION
6.►Go to the TB1 Port located on the Left side of the Power Supply Module.
7.►Insert the Incoming 120 VAC Black (HOT) wire into the Circuit marked "L".
8.►Insert the Incoming 120 VAC White (Neutral) wire into the Circuit marked "N".
9.►Insert Green (Grounding) wire into the Circuit marked "PE".
DANGER
Ground Wire
On/Off
Power Switch
S1
-CIRCUIT-
-BREAKER-
RED INDICATES
POWER IS OFF
PRESS
TO
RESET
TB1
NOISE
FILTER
AC 115V ± 10%
50 / 60 Hz
ConnectIncoming120VACWires
Disconnect power to the junction box prior to making any electrical connections.
Failure to do so may result in serious personal or fatal injury. When uncertain
whether power supply is disconnected, always verify using a voltmeter.
Wiring must meet all local, state, federal or other governing agency codes.
Electric Service Access Hole located at the left or right side of Jamb Tube and Header End Cap.
a.
It is recommended for the Installer to house all Incoming 120 VAC wires within an
Electrical Conduit.
Keep all Incoming 120 VAC wiring separate from low voltage wiring within Header.
Do Not route 120 VAC wires near the U30 Microprocessor Controller and Operater.
Power Supply.
Read and understand the "U30 Controller Setup and Programming Manual"
P/N 15-9000 before attempting to power-up the GT-1175 Slide Door. Failure to do
so may result in damage to the Slide door and/or injury to the installer and will
nullify all warranties.
Power Supply
P/N V-00029
POWER SUPPLY
ASSEMBLY
P/N 9418800100
NABCO
ENTRANCES, INC.
14-11741
TB2
T1
Auxiliary 120 VAC Power wires
(These wires normally coiled and ed up)
ElectricalInstallationManualU-30"D"Control
U30 Microprocessor Control
P/N V-00020
12
7
0
120 VAC
Figure 3-1 Connect Incoming 120 VAC Wires to Power Supply
Part #C-00121
Motor/Operator
P/N M-00395
WARNING
!
No.
HANDY TERMINAL・6P
!
To protect against risk of fire
MOTOR・12P
or electric shock,use only the
Microprocessor Controller
certified NABCO power supply.
248901-
Mode SW Usage
POWER
M0
M1
MODE
NABC O
Open
Open
FUNCTION [SLIDING DOOR]
TWO WAY
SYMBOL
No.
61
Gnd
Open
ONE WAY
12VDC+
9DC12V
1
GYRO TECH
Gnd
Gnd
HOLD OPEN
12VDC-(Common)
7
2
6B
Open
Gnd
NIGHT
Interior Activation
61
3
H
Holding Beam
6B
4
Reduced Opening Switch
H
5
CAUTION
62
!
M0
6
Mode Switch (see Mode SW Usage shown left)
M1
7
BA
Exterior Activation
62
8
!
Sequential Activation
ERROR
Adjustments to the door can only be made
SQ
9
Breakout Detector
BA
10
with the NABCO Handy Terminal.
Sidelite Presence Sensor
SLS
11
Contact Output (Class2 Load only)
Do not disassemble the control box.
N/O
OUT.A
12
30V(42.4Vpeak)max.
N/C
OUT.B
13
There are no user serviceable parts
5Amax.(0-20V), 3.2Amax.(20-30V)
Common
OUT.C
14
inside.
Auxiliary Output (Open-Collector)
OUT
15
!
To maintain warranty,repairs must be
12VDC-(Common)
7
16
made by authorized NABCO facilities.
DN 0647
3-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents