Operation
BA SCV_EN
V05 | 04.2013
Ensure that the filled drinking water does not touch the closed drinking water tank lid.
Option: Mains water supply
See also "Installation and commissioning" - "Changeover from mains water supply to drinking
water tank"
► Connect to the water mains the hose for the supply of water to the coffee machine.
► Open the water valve on the water supply line.
Milk
Option 1: Milk Smart
No more than 40 cm should be between the milk package and the beverage outlet.
► Have fresh, pre-cooled milk (3 – 5°C) ready.
► Hang the hose or hoses into the milk.
The hose end must be in contact with the container floor.
See also "Safety notes" - "Hygiene" - "Milk".
Option 2: Side cooling unit
► Open the door.
► Remove and rinse the milk container.
► Fill in fresh, pre-cooled milk (3 – 5°C).
► Place the milk container into the cooling unit.
► Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
► Close the door.
Option 3: Internal cooling unit
► Remove the left-hand door or cover.
► Remove and rinse the milk container.
► Fill in fresh, pre-cooled milk (3 – 5°C).
► Place the milk container into the cooling unit.
► Hang the hose or hoses into the container.
The hose end must be in contact with the container floor.
See "Installation and commissioning" - "Connecting the milk supply" for further specifications
on milk nozzles.
► Close the door or cover.
www.schaerer.com
25
Need help?
Do you have a question about the Coffee Vito and is the answer not in the manual?
Questions and answers