f.
Secure swivel pin with pin (F) and lynch pin.
g. Assemble PTO driveline male half (G) onto
driveline (H) on APT hitch. Push male half so
that driveline is at its fully compressed length.
h. Locate driveline in hook (J).
i.
Proceed
to
CONDITIONER/TRACTOR HOOKUP.
169561
UNLOADING AND ASSEMBLY
F
G
J
H
STEP
15.
MOWER
24
Revision C