Step 12. Install Center-Link; Mechanical Link; Hydraulic Link; Step 13. Remove Banding At Lift Cylinders - MacDon R85 Unloading And Assembly Instructions

Rotary disc 13 foot pull-type mower conditioner
Table of Contents

Advertisement

STEP 12. INSTALL CENTER-LINK

A
a. Lift front corner of header using a lift jack (A)
until the shipping brace (B) is loose.
b. Remove clevis pins (C) securing brace to
header and carrier frame, and remove brace
(B). Retain pins for re-installation.
c. Lower header to ground.
d. Raise front of APT hitch with the jack to allow
installation
of
the
center-link or optional hydraulic link.
A. MECHANICAL LINK
E
a. Attach mechanical link (D) to carrier frame with
clevis pin (C). Secure with cotter pin.
b. Loosen nut (E).
169561
UNLOADING AND ASSEMBLY
B
C
adjustable
mechanical
D
C
C
c. Rotate the turnbuckle sleeve (F) so that link can
be connected to header.
when holes are aligned, and secure with cotter
pin.
d. Rotate sleeve (F) to approximately mid-position.
e. Snug up nut (E), but do NOT over-tighten.
A slight tap with a small hammer is sufficient.
B. HYDRAULIC LINK
a. Refer to instructions provided with hydraulic
center-link kit for installation procedures.
STEP 13. REMOVE BANDING AT
LIFT CYLINDERS
a. Cut the banding that secures the LH and RH lift
cylinders to the carrier frame.
22
F
E
Insert clevis pin (C)
Revision C

Advertisement

Table of Contents
loading

Table of Contents