Kyocera FS-2020D Service Manual page 74

Hide thumbs Also See for FS-2020D:
Table of Contents

Advertisement

2J0/2J1/2J2
1-5-7
Fuser section
(1) Detaching and refitting the fuser unit
Procedure
1. Draw the rear unit.
2. Insert a flat-blade screwdriver to push the
fuser lock (gray colored) on the rear unit and
the fuser unit is separated from the rear unit
(rails).
Do it both ends of the rear unit.
3. Check or replace the fuser unit and refit all
the removed parts.
Place the fuser unit on the rear unit (rails)
and push the fuser lock so that the fuser
lock catches the fuser unit.
Do it for the both ends of the fuser unit.
1-5-16
Downloaded from
www.Manualslib.com
manuals search engine
Fuser unit
Rail
Rail
Fuser lock
(gray colored)
Flat-blade
Fuser lock
screwdriver
(gray colored)
Figure 1-5-20
Rear unit
Flat-blade
screwdriver

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fs-4020dnFs-3920dn

Table of Contents