Configuring Collaboration Between The Track Module And The Application Modules - H3C S5120-EI Series Operation Manual

Hide thumbs Also See for S5120-EI Series:
Table of Contents

Advertisement

When you configure a Track object, the specified NQA test group and Reaction entry can be
nonexistent. In this case, the status of the configured Track object is Invalid.
Configuring Collaboration Between the Track Module and the
Application Modules
Configuring Track-Static Routing Collaboration
You can check the validity of a static route in real time by establishing collaboration between Track and
static routing.
If you specify the next hop but not the egress interface when configuring a static route, you can
associate the static route with a Track object and thus check the validity of the static route according to
the status of the Track object.
If the status of the Track object is Positive, then the next hop of the static route is reachable, and
the configured static route is valid.
If the status of the Track object is Negative, then the next hop of the static route is unreachable,
and the configured static route is invalid.
Follow these steps to configure the Track-Static Routing collaboration:
To do...
Enter system view
Configure the Track-Static
Routing collaboration, so as to
check the reachability of the
next hop of the static route
Use the command...
system-view
ip route-static dest-address
{ mask | mask-length }
next-hop-address track
track-entry-number
[ preference preference-value ]
[ tag tag-value ] [ description
description-text ]
1-3
Remarks
Required
Not configured by default.

Advertisement

Chapters

Table of Contents
loading

Table of Contents