Gamma 5800 Els Owner's Manual page 21

6 point mounting
Hide thumbs Also See for 5800 Els:
Table of Contents

Advertisement

STRINGING THE FRAME
Clamping the First Main String
Secure the tensioned main string using the
remaining f xed clamp. Repeat the proce-
dure for all of the remaining main strings
and tie off at the appropriate holes following
the racquet manufacturers specif cations.
This will determine the starting point for the
cross strings. If applicable, tie the f rst cross
string using an appropriate starting knot.
Weaving the Cross Strings
Weave the cross strings over and under
the main strings being careful to alternate
the weave of each consecutive cross string
to be opposite of the previously installed
cross string.
Completing the String Job
Once the f nal cross string is tensioned
and clamped, tie off at the appropriate hole
specif ed by the racquet manufacturer. Re-
move the frame from the Mounting System
by loosening the Shoulder Supports and
Frame Supports.
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

8800 els

Table of Contents