Gamma 5800 Els Owner's Manual page 19

6 point mounting
Hide thumbs Also See for 5800 Els:
Table of Contents

Advertisement

STRINGING THE FRAME
holes at the appropriate end of the frame and continue through the opposite center holes.
Thread one end of the string through the adjacent grommet hole and pull excess by hand.
Secure one of the strings using a string clamp.
CAUTION:
NEVER TENSION A STRING WITH YOUR FINGERS BETWEEN
THE STRING AND THE STRING GUIDE AS SERIOUS INJURY COULD RE-
SULT IF YOUR FINGER IS CAUGHT BETWEEN THE STRING AND STRING
GUIDE DURING TENSIONING.
GENCY.
Stringing the Mains
Follow the manufacturer 's recommended
stringing pattern for one or two piece
stringing.
To determine which end of the racquet to
start installing the string count the number of
grommet holes located in the throat bridge.
If there are 2 or 6 holes start main strings
at the center 2 holes of the throat bridge. If
there are 4 or 8 holes start the main strings
at the center 2 holes of the tip.
To begin stringing the main strings, thread the
two ends of the string through the two center
Pulling Tension
Remove excessive slack in the string before
applying tension. To apply tension to the main
string, wrap the string clockwise around the
String Guide to ensure that the proper tension
will be applied to the string.
Insert the string between the String Gripper
Plates and pull the string towards you at a
slight angle to the front gripper plate to help
engage the string. As tension is applied, the
Gripper Plates will engage to grip the string.
For adjustment of the parallel plates, see "Set-
ting the Gripper Plate Spacing" on page 25.
PUSH ANY BUTTON IN CASE OF EMER-
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

8800 els

Table of Contents