Rheem 96v series Installation Instructions Manual page 64

4 position condensing two-stage, communicating gas furnaces w/ecm blower
Table of Contents

Advertisement

OPTIONS 8 & 9: 2 & 3 SIDE WALL VENT TERMINATIONS
FOR 2 PIPE: RXGY-G02
FOR 3 PIPE: RXGY-G01
This termination is for horizontal venting only. This termi-
nation may be installed with either a non-direct-vent or a
direct-vent system. When installed as non-direct vent,
only one wall penetration is necessary for the exhaust
vent.
IMPORTANT: Do not install on the prevailing winter wind
side of the structure.
IMPORTANT: Maintain a minimum of 12 inches (U.S.)
above grade or the highest anticipated average snow level
(whichever is greater) to the bottom of the vent cover or, in
Canada, terminations must conform with CSA B149.1-10,
Sect. 8.14, Canadian Natural Gas and Propane Installa-
tion Code.
NOTE: Dimensions between the inlet and outlet pipes (di-
rect-vent only) are fixed by the sidewall termination. Other
drawings in this manual which specify minimum and/or
maximum distances (vertical and horizontal) between
pipes do not apply to the sidewall termination kit.
NOTE: Multiventing – NO COMMON VENTING IS PER-
MITTED WITH THIS KIT.
FIGURE 30
VENT KIT INSTALLATION OPTIONS
ST-A1194-46
64
8"
MIN.
8"
MIN.
NOTE: With this option a trap on the inlet combustion
air pipe is NOT required.
NOTE: Install the vent and air intake piping into the vent
plate openings. Seal all gaps between the pipes and wall.
BE SURE TO USE SILICONE SEALANT to seal the vent
pipe to the vent cap to permit field disassembly for annual
inspection and cleaning. Also seal all pipe penetrations in
the wall. DO NOT INSTALL VENT KITS ONE ABOVE
THE OTHER to prevent the possibility of condensate
freeze-up or recirculation.
NOTE: Vent should protrude a maximum of 2-1/4 inches
beyond the vent plate. Air intake should protrude a maxi-
mum of 1 inch beyond the vent plate.
NOTE: The RXGY-G02 termination can be used with 3"
vent pipe. A maximum of 18" of 2"
fore penetrating the wall.
Complete installation instructions are included with these
kits.
FIGURE 31
TYPICAL INSTALLATION – DIRECT VENT
3" PIPE
WITH
OPTIONAL
2" TERMINATION
2" PIPE
(RXGY-G02)
OR
3" PIPE
(RXGY-G01)
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
ST-A1194-46
pipe can be used be-
MAINTAIN 12"/31cm FOR THE U.S. AS THE
TO CSA B149.1-10, SECT. 8.14.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96mdv series

Table of Contents