Rheem 96v series Installation Instructions Manual page 56

4 position condensing two-stage, communicating gas furnaces w/ecm blower
Table of Contents

Advertisement

OPTION 3: ALTERNATE HORIZONTAL TERMINATION
Figure 19 shows the alternate non-direct vent horizontal termination with minimum clearances.
FIGURE 19
ALTERNATE HORIZONTAL NON-DIRECT VENT TERMINAL
8" to 12"
FROM
WALL
TIP PORTION
MUST REMAIN
VERTICAL
60" Max.
12"/31cm ABOVE GRADE
OR AVG. ANTICIPATED
SNOW LEVEL. FOR
CANADIAN INSTALLATIONS,
TERMINATIONS MUST
CONFORM TO CSA
B149.1-10, SECT. 8.14.
OPTION 4: RXGY-G02 SIDE WALL
VENT TERMINATION
See Figure 20 and refer to the DIRECT VENT
Section, OPTION 8: SIDEWALL VENT KIT of
this manual for information and directions on
the side wall vent kit. The sidewall vent kit
(RXGY-G02) can be used for both direct-vent
and non-direct vent installations.
56
VENT MAY BE ROTATED AS
MUCH AS 45° LEFT OR
RIGHT FROM VERTICAL AS
LONG AS TIP PORTION RE-
MAINS VERTICAL.
45°
45°
ST-A1194-19
FIG F
FIGURE 20
TYPICAL INSTALLATION – NON-DIRECT VENTING
FIELD SUPPLIED
REDUCING COUPLING
3" ∅ PIPE (RXGY-G02)
18"/46CM MAXIMUM OF 2" PIPE
2" ∅ (RXGY-G02) OR 3" ∅ (RXGY-G01) PIPE
MAINTAIN 12"/31cfm FOR THE U.S. AS THE
MINIMUM CLEARANCE ABOVE THE HIGHEST
ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER
IS GREATER. IN CANADA TERMINATIONS MUST CONFORM
TO CSA B149.1-10, SECT. 8.14.
ST-A1194-53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96mdv series

Table of Contents