Checklist:
Review:
___
VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
___
ALL DRAIN PORTS ARE PLUGGED
___
UNIT HAS FORWARD PITCH
___
HEAT TAPE INSTALLED(IF REQUIRED)
___
CONFIRM THAT ALL HOSES ARE FREE OF KINKS
___
CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
___
BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION
___
ALL CLAMPS AND COUPLINGS ARE TIGHTENED
___
DOUBLE CHECK DIFFUSER IS INSTALLED IN INTAKE COUPLING
Notes:
22
ST-A1194-30-X0