Rheem 96v series Installation Instructions Manual page 35

4 position condensing two-stage, communicating gas furnaces w/ecm blower
Table of Contents

Advertisement

3
4
DISCARD
4b
4a
NOTE: STEPS 5 - 7 SHOWN WITH FURNACE IN DOWNFLOW ORIENTATION
5
ROTATE
UNIT 180°
5a
5a - ROTATE UNIT 180°
5b - REMOVE KNOCKOUTS WITH HAMMER AND FLAT HEAD SCREWDRIVER.
5c - PRE-DRILL (2) Ø 1/8" HOLES IN BLOWER SHELF AS SHOWN FOR FLUE PIPE ASSEMBLY.
5d - PRE-DRILL (3) Ø 1/8" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP.
5e - THE JUNCTION BOX WILL HAVE TO BE RELOCATED FOR FLUE PIPE INSTALLATION
NOTE: SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS.
INSTALL HOSE G ON COLLECTOR BOX AS SHOWN.
NOTE: LET THE OPEN END HANG FREE UNTIL STEP 10.
4a - RE-INSTALL ELBOW AND COUPLINGS (FROM STEP 1)
IN THE ORIENTATION AS SHOWN.
4b - REMOVE Ø .403" DRAIN PLUG FROM ELBOW DRAIN
PORT - DISCARD.
4c - INSTALL 1/2" VINYL CAP (YELLOW) ON INDUCER COUPLING.
NOTE:LEAVE COUPLING CLAMP CONNECTIONS LOOSE UNTIL STEP 10.
NOTE:
IF THE IDB COUPLING IS REMOVED, IT MUST BE REPLACED IN THE
PROPER ORIENTATION. AN ARROW IS PRESENT ON THE COUPLING
TO INDICATE THE DIRECTION OF EXHAUST FLOW. MAKE SURE THE
ARROW POINTS IN THE CORRECT DIRECTION.
INSTALL
4c
5b
REMOVE KNOCKOUTS
RELOCATE JUNCTION BOX AND DOOR SWITCH
SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS
5e
DRILL (3) 1/8" HOLES
IN JACKET
5d
DRILL (2)
Ø 1/8" HOLES
IN BLOWER
SHELF
5c
ST-A1194-34-01
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

96mdv series

Table of Contents