Operating Checks - Valor BR622 Installer's Manual

Hide thumbs Also See for BR622:
Table of Contents

Advertisement

11.3.2 Place a medium size coal behind and
approximately midway between the two
front loose coals which are to the left of
centre. Similarly place another medium
size coal behind and between the loose
coals which are to the right of centre.
Then, Place the large loose coal between
these two with the arrow underneath
and pointing to the back. See figure 38.
figure 38
Middle row of coals
11.3.3 Place the two small loose coals near the
rear corners of the burner compartment
and touching the sidewalls (See figure 39).
figure 39
Rear corner coals
INSTALLER GUIDE
11.3.4 Place the remaining two medium size
12.FULL OPERATING CHECKS
12.1
1.
2.
12.1.1 Make sure the slider button is at the off
12.1.2 Open the isolating valve on the inlet
12.1.3 Slide the button to the bottom (ignition)
Page 19
figure 40
Rear inner coals
coals at the back of the burner
compartment and between the two
small loose coals (See figure 40).
CHECK THE
The control position markings on the
front surround are shown in figure 41
Please note
When first turned on from cold, the
flames will appear predominantly blue.
When operating the fire for the first
time, some vapours may be given off
which could set off smoke alarms in the
vicinity. These vapours are quite normal
with new appliances. They are totally
harmless and will disappear after a few
hours use.
position (at topmost position marked
"O" on the front surround).
elbow.
position marked
position to ignite the pilot. The burner
should ignite at its lowest setting within
CONTROL
. Retain in this

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents