Valor BR622 Installer's Manual page 16

Hide thumbs Also See for BR622:
Table of Contents

Advertisement

9.2
The ceramic sidewalls can be installed
in two alternative arrangements:
a)
With the brick pattern visible - Fit the
wall stamped "A" at the right side and
the wall stamped "B" at the left side.
b)
With the plain wall surfaces visible - Fit
the wall stamped "B" at the right side
and the wall stamped "A" at the left
side.
Find out which arrangement the customer
requires. Explain that the customer can
not alter the wall arrangement after the
front casting is installed.
Fit the ceramic sidewalls against the side
faces of the burner compartment. The
bottom edges of the walls should rest
on the ledges at the sides of the fire box
and the top of the walls should locate in
the space between the black cross
member and the side walls of the burner
compartment (See figure 27).
figure 27
Ceramic side walls installation
10.FRONT SURROUND &
CONTROL LINKAGE
INSTALLATION
10.1
Remove the tape securing the control
linking bar to the front surround. Slide
the control button upwards as far as it
will go. Make sure that the bottom of the
linking bar is higher than the bottom of
the front surround.
10.2
Carefully lift the front surround. Do not
lift it by the control button.
INSTALLER GUIDE
10.2.1 "Adorn" Surround
Page 16
Place the front casting against the
fireplace front surface so that the
retaining strip at the back of the casting
is above the two upper retaining
brackets at the top of the convection
box. Lower the casting making sure that
the rear retaining strip locates fully over
the retaining brackets on the convection
box (See figure 28). If the inlet
pipe runs along the front of the
fireplace, the bottom of the casting will
have to be swung forwards to clear the
pipe while lowering the casting.
Swing the bottom control linking bar
towards the centre of the fire to clear the
front casting. Slide the front casting
sideways, if necessary, to align the
bottom fixing holes
with those in the convection box. Fix the
bottom of the casting to the convection
box with two screws (See figure 29).
figure 28
"Adorn"Front casting top location
figure 29
"Adorn" front casting bottom fixing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents