Glass Frame; Frame Sealing Rope; Coal Bed - Baxi Arena Super Installation And Servicing Instructions

Gas burner
Table of Contents

Advertisement

Changing Components - Page 22

Glass Frame

1. Ensure that the glass panel is cold. Disengage the
retaining clamps.
Lift the frame away.
Fix the new glass frame in position and engage the retaining
clamps. Re-assemble the components in the reverse order
to dismantling.

Frame Sealing Rope

1. Ensure that the glass panel is cold. Disengage the
retaining clamps.
2. Pull the old rope seal out of the locating channel and
release the glass locating brackets.
Fit the new seal, starting at the centre, tuck well into the
locating channel. Ensure that there is an equal amount of
seal free at either end of the channel. Secure the glass
locating brackets.
Fix the glass frame in position and engage the retaining
clamps. Re-assemble the components in the reverse order
to dismantling.
Check that the seal between the rope and the glass frame is
good.

Coal Bed

1. Ensure that the glass panel is cold. Disengage the
retaining clamps.
Lift the frame away.
3. Lift the coal bed away from the locating pins.
CAUTION: The coal bed is extremely fragile and must
be handled accordingly. Gloves should be worn and any
inhalation of the dust should be avoided. Keep the coals
away from children at all times.
Carefully fit the new coal bed in position on the locating pins.
Fix the glass frame in position and engage the retaining
clamps. Re-assemble the components in the reverse order
to dismantling.
22
Supplied By www.heating spares.co Tel. 0161 620 6677

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Baroque super

Table of Contents