3.0 Power Test
3.1. Plug in the CyberData device and monitor the LED activity on the front of
the device. See the following figure:
3.2. The
GREEN
immediately. The activity LED illuminates
YELLOW/GREEN
Amplifier is established. The activity LED blinks to indicate network traffic.
After about 27 seconds, the
that the amplifier is fully booted.
If there is no DHCP server available on the network, it will try 12 times with a
three second delay between tries and eventually fall back to the
programmed static IP address (by default 10.10.10.10). This process will
take approximately 80 seconds.
3.3. When the device has completed the initialization process, press and hold
the RTFM switch for 3 seconds to announce the IP address.
This concludes the power test. Go to
in a Test
Environment".
Quick Start Guide
power and status LEDs and the
for a 100MB when the network link to the Paging
GREEN
Activity LED (GREEN)
Link LED (GREEN/YELLOW)
YELLOW
GREEN
for a 10Mb link or
status LED will blink twice to indicate
Section 4.0, "Connecting to a Network
link LED come on
930459D
Need help?
Do you have a question about the V2 and is the answer not in the manual?
Questions and answers