Planning The Installation Process - Sun Microsystems Ultra 45 Getting Started Manual

Hide thumbs Also See for Ultra 45:
Table of Contents

Advertisement

Planning the Installation Process

Use the following checklist as a process tool to assist you with installation of the Sun
Ultra 45 and Ultra 25 workstations.
TABLE 1-1
Steps
1.
2.
3.
4.
5.
Note – Refer to the Sun Ultra 45 and Ultra 25 Workstations Service and Diagnostics
Manual (819-1892), found on the Sun Sun Ultra 45 and Ultra 25 Workstations
Hardware Documentation CD (705-1341), or online at:
http://www.sun.com/documentation prior to performing any service or
maintenance.
2
Sun Ultra 45 and Ultra 25 Workstations Getting Started Guide • May 2006
Installation Process
Tasks
Unpack the workstation and familiarize yourself
with the workstation features.
Install any optional components.
To install DIMMs, graphic accelerators, PCI cards,
hard drives, diskette drives, tape drives, or DVD-
ROM drives.
Connect the workstation and external device cables.
Power on the workstation.
Answer the Solaris™ software prompts.
Reference
"Shipping Kit Contents" on
page
3.
"External System
Description" on page
4.
Sun Ultra 45 and Ultra 25
Workstations Service and
Diagnostics Manual (819-
1892) or the documents that
ship with the components.
"Cable Connections" on
page
6.
"Powering On" on page
"Setting Up Preinstalled
Software" on page
8.
7.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra 25

Table of Contents