Toro 30381N Operator's Manual page 15

Traction unit
Table of Contents

Advertisement

Figure 19
1. Tank hose
6. Connect the drive shaft to the gear box shaft in the
winter frame and torque the bolts (5/16 inch) to 20 to
25 N-m (175-225 in-lb). Install the roll pin (Figure 20).
Figure 20
1. Pressure hose
2. Tank hose
3. Hose cover
7. Adjust the floor jack to line up the 1.00 inch holes in the
frame and install a coupler pin on each side (Figure 21).
2. Pressure hose
4. Cable tie
5. Bolts
6. Roll pin
1. Coupler pin
8. Adjust the floor jack or rock the cab with your hands
as required to install the bolts (3/4 inch) on each side
(Figure 22). Torque the bolts to 359 N-m (265 ft-lb).
1. 3/4 inch bolts
Note: The rear tires will need to be removed to torque
the rear bolts (3/4 inch). After torquing the frame
bolts, install the rear tires and torque lug nuts to 88 to
115 N-m (65 to 85 ft-lb).
9. Insert a rubber mount onto each cab mount at the rear
mounting locations (Figure 23).
15
Figure 21
Figure 22
2. Coupler pin

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 7210

Table of Contents