Remove the lift cylinder pins to gain access to the bolts
on the right hand side. Torque the bolts to 265 foot
pounds.
Figure 7
1. 3 mounting bolts (3/4 inch), washers and nuts (Left side)
5. Remove the fasteners securing the vertical tube support
assemblies to the rear of the deck frame (Figure 8) or
to the conversion brackets (Figure 9). Also, remove the
conversion brackets from the deck frame, if applicable.
Figure 8
1. Deck frame
2. Vertical tube support
3. Clevis pin & screw pin
retainer
1
6
1. Deck frame
2. Flange nut
3. Conversion bracket (left
side shown
4. Screw
6. Pivot open the floor plate (Figure 10).
1. Floor plate
7. Slide the drive shaft onto the gearbox shaft (Figure 11).
Install the roll pin and torque the bolts to 20-25 N-m
(175-225 in-lb).
12
Figure 9
5. Self tapping screw
6. Vertical tube support
assembly
7. Self tapping screw
Figure 10
2
3
4
5
G024845