Figure 38
1. Coupler pin
8. Adjust the floor jack or rock the cab with your
hands as required to install the bolts (3/4 inch) on
each side (Figure 39). Torque the bolts to 265 ft-lb
(359 N⋅m).
Figure 39
1. 3/4 inch bolts
Note: The rear tires will need to be removed to
torque the rear bolts (3/4 inch). After torquing the
frame bolts, install the rear tires and torque lug nuts
to 65 to 85 ft-lb (88 to 115 N⋅m).
9. Insert a rubber mount onto each cab mount at the
rear mounting locations (Figure 40).
2. Coupler pin
1. Cab mount
10. Lower the cab into position by slowly and evenly
loosening the jacking bolts on each end of the
jacking tube (Figure 41).
1. Jacking bolts
11. At the rear mounting points, secure the cab to the
machine with a bolt (1/2 x 3 inches), steel washer
(1/2 x 2–1/2 inches), rubber washer (1/2 x 2–1/2
inches) and nut (1/2 inch) (Figure 42). Tighten all
four cab mount bolts until the rubber mounts are
compressed to a thickness of 7/8 inch (2.2 cm).
26
Figure 40
2. Rubber mount
Figure 41
2. Cab jack tube