Advertisement

SLIDING GATE
119 BJ04E N
OPERATOR
BK-221E
EN

Advertisement

Table of Contents
loading

Summary of Contents for CAME BK-221E

  • Page 1 SLIDING GATE 119 BJ04E N OPERATOR Installation manual BK-221E...
  • Page 2 • Cut other use is dangerous. CAME S.p.A is not liable for any damage caused by off the power supply before releasing the operator for manual openings and improper, wrongful and unreasonable use •...
  • Page 3 ☞ This symbol shows which parts to tell users about. REFERENCE REGULATIONS Came Cancelli Automatici S.p.A. is certified for the: ISO 9001 quality and ISO 14001 environmental management systems. This product complies with the current regulations mentioned in the declaration of conformity.
  • Page 4 Description of parts Cover Gearmotor Control board Front cover Anchoring plate Nut plate UNI5739 M12X70 screw Control-board housing 10. Release key 11. Endstop fins 12. Mechanical endstop 13. UNI6954 3.9X13 screw 14. UNI6954 3.9X22 screw 15. Fan 16. Transformer 17. Encoder 18.
  • Page 5 Tools and materials Make sure you have all the tools and materials you will need for installing in total safety and in compliance with applicable regulations. The figure shows some of the equipment installers will need. Cable types and minimum thicknesses Cable length Cable length Cable length...
  • Page 6 Laying the anchoring plate Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole. The foundation frame must jut out by 50 mm above ground level. Fit an iron cage into the foundation frame to reinforce the concrete. Fit the bolts into the fastening plate and lock using the nuts.
  • Page 7 Remove the nut and washer from the bolts Fit the electric cables into the tubes so that they come out about 600 mm. Setting up the gearmotor Remove the front cover and gearmotor cover. Place the gearmotor above the anchoring plate. Careful! The electric cables must pass under the gearmotor box.
  • Page 8 Fastening the rack  If a rack is already in place, move directly to adjusting the rack-pinion coupling distance, otherwise, follow the fastening instructions as explained below: - release the gearmotor (see gearmotor releasing paragraph); - rest the rack (module 4) above the gearmotor pinion; - weld or fasten the rack to the gate along its entire length.
  • Page 9 Fastening the gearmotor Once adjusting is complete, fasten the gearmotor to the plate using the plates and nuts. Establishing the endstop points For opening: - completely open the gate; - fit the opening endstop fin onto the rack until the micro switch activates (spring); Spring - fasten it using the allen screws For closing:...
  • Page 10 ELECTRICAL CONNECTIONS AND PROGRAMMING Warning! Before working on the control panel, cut off the main current supply and, if present, remove any batteries. Powering up the control board and command and control devices: 24 V AC/DC. Functions on the input and output contacts, time adjustments and user-management settings are set and viewed on the programming board's display. All connections are quick-fuse protected.
  • Page 11 Power supply Terminals for powering 24 V AC - max 20 W accessories Grey Black Blue White Orange Brown Power supply 230 V AC frequency 50/60 Hz 0 10 11 TS 1 2 E1 EX W L1T L2T CT VS VF Factory wiring The gearmotor is already connected.
  • Page 12 Command and control devices Stop button (NC contact). For stopping the gate and excluding automatic closing. For movement to resume, press the command button or other control device. N.B.: if unused, select 0 (Deactivated) from function F 1. ONLY OPEN function from control device (NO contact) PARTIAL OPENING function from control device (NO contact) ONLY CLOSE function from control device (NO contact) OPEN-STOP-CLOSE-STOP sequential function / OPEN-CLOSE-INVERT step-...
  • Page 13 Safety devices DELTA-S Photocells photocells photocells Configure contact CX, CY or CZ (NC), input for EN 12978 safety devices like photocells. See CX input functions (Function F2), CY (Function F3) or CZ (Function F4) in: - C1 reopening during closing. When the gate is closing, opening the contact triggers the inversion of movement until the gate is fully open;...
  • Page 14 Functions managing devices Connecting the RS485 serial with RSE board to the home automation A B GND system via CRP (Came Remote Protocol) or for paired operation (see Fit the RSE card. chapter on PAIRED CONNECTION WITH A SINGLE CONTROL)
  • Page 15 Description of programming commands The ESC button is for: - exiting menus; - cancelling changes. The < > keys are for: - moving from one item to another; - increasing or decreasing values. Display The ENTER key is for: - entering menus; - confirming or memorizing set values.
  • Page 16 Functions map Total stop function (1-2) Function associated to input 2-CX Function associated to input 2-CY Function associated to input 2-CZF 5 Safety test function Maintained action function Control mode on 2-7 Obstruction detection with motor idle function F 10 Warning light function F 11 Encoder exclusion...
  • Page 17 Input [2-CZ] 0 = Deactivated (default) / 1 = C1 / 2 = C2 / 3 = C3 / 4 = C4 / 7 = C7 / 8 = C8 NC input – Can associate: C1 = reopening during closing by photocells, C2 = reclosing during opening by photocells, C3 = partial stop, C4 = obstruction wait, C7 = reopening during closing by sensitive safety-edges, C8 = reclosing during opening by sensitive safety-edges.
  • Page 18 F63 Change COM speed 0=1200 Baud / 1=2400 / 2=4800 / 3=9600 / 4=14400 / 5=19200 / 6=38400 / 7=57600 / 8=115200 Baud For setting the communication speed used in the CRP (Came Remote Protocol) connection system. Partial opening time 5 = 5 seconds /..
  • Page 19 Entering a user with an associated command  When entering / deleting users, the fl ashing numbers you see, are available numbers which are usable for entering subsequent users (max. 25 users). User Associated command Select U 1 Press ENTER to confirm. Select a command to associate to the user.
  • Page 20 Travel calibration Before calibrating the gate travel, position the gate half-way, check that the maneuvering area is clear of any obstruction and check that there are mechanical opening and closing stops. The mechanical end-stops are obligatory. Important! While calibrating, all of the safety devices will be disabled excluding the TOTAL STOP one. Select A 3.
  • Page 21 PAIRED CONNECTION WITH A SINGLE CONTROL Connections Only perform on the MASTER board ter- 1 2 3 4 1 2 3 4 UTP CAT 5 minals Ⓐ any connections of the control, warning and safety devices. Connect the two boards using a UTP CAT A B GND A B GND 5 cable on terminals A-B-GND and fit the...
  • Page 22 ERROR MESSAGES Error messages appear on the display The gate travel calibration was interrupted by the activation of the STOP button. Gate travel calibration incomplete. Encoder is broken. Services test error Insufficient working time Release hatch open Closing obstruction. E 10 Opening obstruction. E 11 Maximum number of obstructions detected.
  • Page 23 ☞ CAME CANCELLI AUTOMATICI S.p.A. employs a certified Environmental Management System at its premises, compliant with the UNI EN ISO 14001 standard to ensure the environment is safeguarded. Please continue safeguarding the environment. At CAME we consider it one of the fundamentals of our operating and market strategies. Simply follow these brief disposal guidelines:...
  • Page 24 HU • A vállalatra, termékeire és a műszaki szervizre vonatkozó minden további információért az Ön nyelvén: HR • Za sve dodatne informacije o poduzeću, proizvodima i tehničkoj podršci: UK • Для отримання будь-якої іншої інформації про компанію, продукцію та технічну підтримку: www. came.com www. came.com CAME S.p.A.

Table of Contents