Optional Blower; Blower Operation - Pacific energy NEO 1.6 EU A SERIES Installation And Operating Instructions Manual

Table of Contents

Advertisement

- Combustion Air
Intake or combustion air can be supplied to the stove in one of two ways. Consult your local building code or National In-
stallation Code for Solid-Fuel-Burning Appliances and Equipment before proceeding. The unit must have adequate air for
combustion provided in the room the unit is installed in.
1. Outside air supply - (Necessary for mobile home installation, optional for residential installation.) Outside air may be
drawn from either underneath the stove or from behind.
Cut or drill a 100mm diameter hole directly below the bottom hole of the damper enclosure. Connect enclosure to the
floor with a short pipe. If you wish to connect the outside air to the rear hole on the ash box, then remove the or cover
plate on the bottom of the unit. This hole must get its air from a ventilated crawl space or be extended with duct to the
outdoors (see Figure #8, Page 13). The use of outside combustion air for residential installation requires the unit to be
secured to the structure to prevent dislodging of the air duct.
2.
Room air supply - Remove the cover plate or knockout from the rear of the ash box enclosure. The stove will now
draw its air from the room through this opening and into the firebox intake.
Note:
The living space around the stove must be well ventilated with good air circulation. Anything that may cause a nega-
tive pressure can cause gases or fumes to be pulled into the living area. During extremely cold weather, and especially
when burning at very slow rates, the upper parts of the exposed chimney may ice up, partially blocking the flue gases. If
blockage occurs, flue gases may enter living space.
Note: An outside air pipe shield is provided to place in front of the 4"pipe used to bring outaide air into the unit. Instructions
for instalaltion are provided with the shield.(Part #NE16.7872)
This hole must get its air from a ventilated space
This unit is not designed to be operated with the firing door open. In addition to the
obvious hazard of sparks landing on combustibles, an open fire door will cause the stove to draw
air from the living space and possibly cause suffocation.

Optional Blower

The optional blower kit (WODC.BLOW) is equipped with a three prong power cord and may be installed at any time. Follow
installation instructions supplied with the kit. Route power supply cord away from stove.
Electrical rating: 230 volts A.C., 50Hz, .5 amps.
Fan output rating: 140 CFM

Blower Operation

Proper blower speed matched with air control setting will ensure peak performance from your stove. Operate as follows:
- Air control set to "L" (low), operate blower speed control on "Low".
- Air control set to half way or higher, operate blower speed control on High setting.
Automatic: To operate the blower automatically, set the rocker switch on the side of the fan housing to "Auto" and set the
speed switch to desired setting. This will allow the fan to turn on as the stove heats up to operating temperature. It will also
shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range.
Manual: To manually operate the blower, set the rocker switch to "Man" and set the speed switch to desired setting. This will
bypass the sensing device and allow manual control of the blower.
Switching from "Auto" to "Man" or selecting speed may be done anytime.
NEO 1.6 EU-En 200116-20
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
13

Advertisement

Table of Contents
loading

Table of Contents