Installation

Warning: Under no circumstances is this stove to be installed in a makeshift or "temporary" manner. It may be fired only after
the following conditions have been met.
*
DO NOT ATTEMPT TO CONNECT THIS Stove TO ANY AIR DISTRIBUTION DUCT.
*
Outside combustion air or fresh air into the room may be required in your area, consult local building codes (see Combus-
tion Air section).
- The services of a competent or certified installer, (certified by the Wood Energy Technical Training program (WETT) - in
Canada, Hearth Education Foundation (HEARTH) - in U.S.A.,) are strongly recommended.
BOTH CHIMNEY SYSTEM AND CONNECTOR MUST BE LISTED TO: IN CANADA - ULC S-641 LISTED CONNECTOR
AND ULC-S-629 LISTED CHIMNEY, IN USA - UL-103 HT LISTED CONNECTOR AND CHIMNEY

Clearances

1. This stove must be installed using an approved venting system
2. Clearances to combustible surfaces and materials are shown in Figure #5.
Clearances may be reduced with various heat insulating materials. Consult local fire codes and authorities for approval.
FIG. #5
200mm
NEO 1.6 EU-En 200116-20
400mm
400mm
200mm
355mm
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
400mm
11

Advertisement

Table of Contents
loading

Table of Contents