Warning: Under no circumstances is this heater to be installed in a makeshift or "temporary" manner. It may
be fired only after the following conditions have been met.
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
DO NOT INSTALL IN A SLEEPING ROOM.
Outside air supply must be used for Mobile Home installations - see Figure 6 on page 13.
The services of a competent or certified installer, (certified by the Wood Energy Technical Training program
(WETT) - in Canada, Hearth Education Foundation (HEARTH) - in U.S.A.,) are strongly recommended.

Clearances

This heater must be installed with listed double-wall connector and compatible chimney system, see Figure 5
on page 12.
Clearances to combustible surfaces and materials are shown Figure 5 & Figure 6 .
Clearances may be reduced with various heat insulating materials.
Consult local fire codes and authorities for approval.
NOTE: Longer chimney lengths and different pitch flashings may be used. All other parts listed must be
installed (See Figure 6). Install all components to the connector or chimney manufacturer's installation require-
ments. Consult your chimney supplier for installation advice.

Procedure:

CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF
MUST BE MAINTAINED.
Note: See "Combustion Air" on page 17.
1. Position stove and floor protection with hole for combustion air in accordance with the clearances as
stated on the label and in Figure 5.
2. Mark the position for the hole in the ceiling and roof by using a string and plumb-bob.
3. Check that the intended location will not interfere with floor joists, ceiling joists or rafters before proceed-
ing further.
4. Cut a hole in the ceiling and roof to suit the chimney system and frame in the sides. The chimney support
is mounted to the framing.
5. Assemble chimney sections so the finished length is resting on the support and protruding through the
roof. Avoid having joints between ceiling and roof. Install radiation shield. Assemble flashing and storm
collar and be sure to maintain the vapour barrier at this point. (Seal securely.) Attach rain cap and check
flashing for leaks.
6. Install connector as per manufacturer's instructions.
7. Attach stove to flooring using two 1/4" x 2" or longer lag screws.
SUPER-SD1_100517-32