Preparing Building And Facilities; Building And Facilities Needed To Install A Server System; Furnishings Accompanying A Server System - Fujitsu M10 Series Installation Planning Manual

Hide thumbs Also See for M10 Series:
Table of Contents

Advertisement

CHAPTER 1 Installation Planning Overview
Regarding the required staff in the installation planning group, consider the following:
 An installation planning group and a supervisor within the user organization
 An installation consultant from a Fujitsu or agent
1.3

Preparing Building and Facilities

Review the building and facilities needed to install a server system, ancillary
furnishings accompanying the server system, and the rooms needed to run the server
system.
1.3.1

Building and facilities needed to install a server system

Regarding the building and facilities needed to install a server system, consider the
following:
 Building
 Power supplies
 Air conditioning
 Signal line, telecommunication facilities
 Fire extinguishers, fire extinguishing facilities
1.3.2

Furnishings accompanying a server system

Review the following furnishings accompanying in use of a server system:
 Cabinets and lockers
- Small equipment
- Storage media
- Supplies
- Spare parts and maintenance tools
- Instructions manuals
 Warehouses
- Storage media
 Trucks
4
C120-H007-08EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise seriesPrimequest series

Table of Contents