Download Print this page

Toshiba RAV-104 Series Installation Instructions Manual page 16

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Unit Installation – NH Units
(1) There are EPS cushions protecting the unit from
damage during transportation. They are located under
both side plates. Remove the EPS cushions before
installation. Also, remove the transportation tape from
the electrical box.
(2) Install the indoor unit before construction of the
architectural surround.
Fixing the Unit
G
When fixing the indoor unit to the floor or wall, use ø8mm
anchor bolts using the fixing point on the unit.
Fixing onto the Floor Over-view
GB
Model
RAV-104NH-PE
RAV-134/164/264NH-PE
Fixing onto the Wall – Front View
G
Note: If you are fixing the rear plate onto the wall please
remove the electrical box as shown.
How to Remove the Electrical Box
(1) Remove the two
screws from the
top of the electrical
bracket.
(2) Slide the box along
as indicated by the
arrow and remove
from the unit.
Connection of Ducting
Architectural Surround
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
I
NDOOR
Front surface
A
586
880
Holes on
Floor
rear plate
Fixing
screws (x2)
Electrical box
Air Outlet Grille
(local procurement)
Supply Duct
(local procurement)
Duct Joint Plate
Unit
www.heronhill.co.uk
U
L
NIT
OCATION
To connect the duct, prepare the connection flange
locally as shown:
5-Ø4.7 Hole
RAV-134/164/264NH-PE
8-Ø4.7 Hole
B
610
Duct Outlet
The indoor unit has two choices of air outlet. The indoor
910
unit will already be positioned in the vertical air outlet
direction, if a side/horizontal air outlet direction is required
the following operations are required:
(1) Remove the duct joint plate and front up plate by
removing the screws as indicated below.
Front up plate
Screws
Front of unit
(2) Place the duct joint plate
as shown opposite and fix
by screws.
(3) Place the front up plate as
shown opposite and fix by
screws.
~ 16 ~
~ 16 ~
RAV-104NH-PE
Duct joint plate
SIDE VIEW
Fax: 01823 665807

Advertisement

loading