Download Print this page

Toshiba RAV-104 Series Installation Instructions Manual page 12

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Unit Installation – BH/B Units continued
Connection of Ducting
Supply duct
(local procurement)
Remove the duct connection assembly (attachment)
!
before connecting the supply duct.
The maximum length of
!
flexible ducting is 10m.
G
To connect the shelter
board under the lower air
inlet of unit, prepare the
shelter board locally, as
shown below.
GB
Shelter Board
4 x Ø6 holes
Model (RAV-)
264BH/B
364BH/B, 464BH/B
164BH/B
G
To connect square duct, prepare the connection flange
locally as shown below:
Supply Flanges
RAV-164BH/B
Optional Accessory
G
A TOSHIBA Long-Life Filter Kit is available as an
optional accessory.
G
The Filter Kit can be installed on either the lower or
rear air inlet of the Duct Type unit.
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
I
NDOOR
Return duct (local
procurement)
Shelter board
(local procurement)
Flexible duct
C x Ø6 holes
A
B
C
700
1000
2
1050
1350
2
400
700
12 – ø 6 holes
www.heronhill.co.uk
U
L
NIT
OCATION
RAV-264BH/B
RAV-364BH/B, RAV-464BH/B
Return Flanges
RAV-164BH/B
RAV-264BH/B
RAV-364BH/B, RAV-464BH/B
~ 12 ~
~ 12 ~
14 – ø 6 holes
14 – ø 6 holes
14 – ø 6 holes
18 – ø 6 holes
22 – ø 6 holes
Fax: 01823 665807

Advertisement

loading