Download Print this page

Toshiba RAV-104 Series Installation Instructions Manual page 13

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Unit Installation – CH/CHR/C Units
Before Installation
1
Take off the accessories.
Side
panel
(left)
2
Remove
the hanger
Body
(left, right).
3
Remove all the
metal shipping fix-
tures (left corner,
centre, right cor-
ner).
4
Shipping fixture
(centre)
Detail figure of the hinge
portion
Hinge
Body
Installing Ø 10 Hanging Bolts
Ø Hanging Bolts are procured locally
G
Install hanging bolts at the spacings shown below.
INNER HANGING
Hole for hanging bolt
(4 – 12 x 27 slots)
Hanging bolt pitch
Bmm (Hanging bolt pitch)
Amm
Model (RAV-)
Amm
134CH/CHR/C
1030
164CH/CHR/C
1030
264CH/CHR/C
1230
364CH/CHR/C
1430
464CH/CHR/C
1630
Tel: 01823 665660
Heronhill - for all your Toshiba requirements
I
U
NDOOR
Inlet grille
G
Securely fix left
and right side panels
with a screw
supplied after unit
installation.
Side panel
(right)
10-20mm
Remove the side panels by hand.
Slide them in order of 1 - 2 .
5
Pull the air filter
out then remove
the inlet grille fixing
screws.
To remove the
inlet grille take the
hinge portion off in
order of 1 - 2 .
OUTER HANGING
Hole for hanging bolt
(4 – 12 x 27 slots)
Hanging bolt pitch
Cmm (Hanging bolt pitch)
Amm
Bmm
Cmm
920
1020
920
1020
1120
1220
1320
1420
1520
1620
~ 13 ~
~ 13 ~
www.heronhill.co.uk
L
NIT
OCATION
The positions of the hanging bolts are printed on the carton
box. (The size is not printed.)
Position of hanging bolt
(ø10 printed)
Bmm (inner hanging)
Cmm (outer hanging)
Installing method of the Hanging Bolt
Wooden-strutted room
Install hanging bolts on a square
wooden piece placed over beams.
Wooden
piece
Hanging
bolt
Edge
(sharp
insert)
Installing Hexagon Bolt
M8 x 25mm hexagon bolts (4)
Determining installation position and direction
of the piping and wiring
BACK VIEW
Knock out
(rear attachment)
Drain connection
(OD 20mm)
Liquid line connection
Gas line connection
Opening Knock Out Hole
TOP VIEW
In case of
right or left
attachment
G
The dotted
line indicates
the rear end
of the unit. To
be detached
on the dotted
line.
Newly-built concrete slab
Install hanging bolts with
inserts, embedded bolts, etc.
Beam
Reinforcing bar
Embedded
bolt
(Slide
Embedded bolt
insert)
of piping
(accessory)
Allow a spacing of
about 10mm
SIDE VIEW
Knock out
(right or left attach-
ment)
Cut the slit
portion by a
Slit
saw or knife
Fax: 01823 665807
GB

Advertisement

loading