Turning On The Chassis Power - Nortel 1000BASE-XD Using Manual

Nortel networks switch owner's manual
Hide thumbs Also See for 1000BASE-XD:
Table of Contents

Advertisement

Tighten the retaining screws to secure the module in the chassis
5.
(Figure
Figure 2-5.

Turning On the Chassis Power

Although you can install or replace modules in an operating chassis, in a new
installation you may prefer to install all the modules before turning on the chassis
power.
To turn on the chassis power:
Verify that all power cords are connected properly, as described in the
1.
installation instructions for the power supplies.
Turn all the power switches to the On position.
2.
Note: In a chassis with two power supplies in a nonredundant power
configuration, you must turn on both power supply units within 2 seconds of
each other. If you wait longer to turn on the second power supply, both power
supplies will shut down. To correct this condition, turn off both power
supplies, wait at least 30 seconds, and then turn on both power supplies again
within 2 seconds.
204515-C
2-5).
9400FA
Securing the Module in the Chassis
Installing a Passport 8100 Module
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 8100

Table of Contents