Installing The Cp Piv To I/O Panel Cables - Nortel 1000M Installation And Commissioning Manual

Nortel networks communication server large system installation and commissioning
Hide thumbs Also See for 1000M:
Table of Contents

Advertisement

Page 220 of 456

Installing the CP PIV to I/O panel cables

NN43021-310
Standard 02.01
Cabling Common Equipment in a Multi Group system
Figure 91
CP PIV Core and Network backplanes
Core backplane
Group 2
Group 7
Group 6
Group 5
Group 4
Group 3
j3
j3
j3
j3
j3
j3
slot 11
slot 10
slot 12
slot 12
slot 11
slot 10
port 0
port 1
port 1
port 0
port 1
port 0
j4
j4
j4
j4
j4
j4
slot 12
slot 12
slot 11
slot 11
slot 10
slot 10
port 1
port 0
port 1
port 0
port 1
port 0
NT4N29 cable
j3 slot 9 port 0
j4 slot 9 port 0
Group 0
Connect the cables from the CP PIV card faceplate to the I/O panel on the
back of the Core/Net modules:
COM1 is used to connect a terminal.
COM2 is used to connect a modem.
LAN 1 is used to connect the system to a LAN switch.
LAN 2 is used to connect Core 0 to Core 1 for system redundancy.
Note: If there is no LAN, LAN 1 and LAN 2 are connected from Core 0
to Core 1.This connection is made on the backplane.
December 2007
NT4N89 cable
Network backplane
A B
Group 1
j3
slot 9
port 1
j4
slot 9
port 1
NT4N29 cable
E
System Monitor
(XSM) connections
J3
J2
J1
D
553-9473

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian 1

Table of Contents